New-buck-corporation Heater Model 80 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Fax New-buck-corporation Heater Model 80. New Buck Corporation Heater Model 80 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 27
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
BUCK STOVE
“MEETS PHASE II EPA STANDARDS”
MODEL 80 HEATER
FEATURES
PREPARATION INSTALLATION
OPERATION MAINTENANCE SAFETY
SAFETY NOTICE
If this heater is not properly installed, a house fire may result. For your safety, follow the installation directions.
Contact local building or fire officials about restrictions and installation requirements in your area.
Manufactured by New Buck Corp.—Spruce Pine, NC 28777— Revised 2/03
PN-PI-8000660
Tested by ITS
Vue de la page 0
1 2 3 4 5 6 ... 26 27

Résumé du contenu

Page 1 - BUCK STOVE

BUCK STOVE “MEETS PHASE II EPA STANDARDS” MODEL 80 HEATER FEATURES PREPARATION INSTALLATION OPERATION MAINTENANC

Page 2

POSSIBLE TOOLS NEEDED FOR INSTALLATION If you decide to install your own stove, there are several hand tools you may need to do the job. If you do not

Page 3

MOUNTING THE TRIM PANELS After the unit is positioned, as shown in Figure 2, mark the mounting position of the trim panels as fol

Page 4

11. Pull the unit back out of the fireplace and remove the brass and top trim panel to facilitate the installation of the direct connect or positi

Page 5 - SECTION I

SECTION III RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION INSTALLATION PRECAUTION Extensive field and laboratory testing has

Page 6 - Wood Stove

MODEL 80 Minimum Clearances The New Buck Corporation Model 80 must be installed in compliance with the instructions contained in this manual. Clear

Page 7

Preparing The Stove for Installation 1. Inspect the unit for any obvious physical damage. 2. Check the primary air draft controls to ensure that the

Page 8 - ASH REMOVAL

3. Now connect the stove to the ceiling support box by using #24 ga. minimum blued or black steel chimney pipe. (Do not use galvanized pipe.) Connec

Page 9 - SECTION II

2. Once the through-the-wall thimble codes are met, simply connect the chimney pipe to the wall pass-through connector using #24 ga. minimum, blued o

Page 10 - POSITIONING THE HEATER

ALTERNATIVES FOR WALL PROTECTION Example: The rear clearance for the Model 80 from page 12 is 26". (Measurement A.) This clearance may be redu

Page 11 - MOUNTING THE TRIM PANELS

3. Open the primary air drafts and damper bypass. 4. Plug the power cord into a 115 VAC outlet. 5. Place crumpled pieces of newspaper in the stove.

Page 13 - SECTION III

SECTION IV WOOD HEATER SAFETY Certain safety hazards are inherent in any wood heater installation. You should be aware of these so that a safe and p

Page 14 - TOOLS FOR INSTALLATION

SECTION V OPERATION This section of the manual is to help you get maximum efficiency and maximum smoke (particulate) reduction from your Model 80 he

Page 15 - CHIMNEY

Building a Fire: 1. By-pass damper must be open (pulled out) when starting fire or adding wood to fire. 2. Open the door. 3. While looking inside

Page 16 - Wall Exit Into Metal Tee-Box

SECTION VI PREVENTIVE MAINTENANCE / PARTS REPLACEMENT Disassembly Inspection and Catalytic Replacement The catalysts in your stove are designed for

Page 18

TROUBLESHOOTING Operation of any wood heater can create problems. While the use of a catalytic-combustor equipped stove will substantially lessen some

Page 19

Problem 3. Backpuffing 4. Smoke Rollout when heater door is opened 5. Low Catalytic Temperature 1. Plugg

Page 20 - SECTION IV

NEW BUCK CORPORATION (NBC) “LIMITED WARRANTY” FOR NBC RELATED PRODUCTS PLEASE READ THIS WARRANTY CAREFULLY PRODUCTS COVERED This warranty covers t

Page 21 - SECTION V

TABLE OF CONTENTS SECTION I Room Heater Features ...

Page 23 - SECTION VI

SECTION I The New Buck Corporation room heater Model 80 is one of the safest and most efficient heating systems available when installed and operate

Page 24

1114573283A612910133215313026222427232528181. By Pass Damper & Brass Spring Handle2. Blower Control (Rheostat)3. Primary Air Control (Right

Page 25

EPA COMPLIANCE STATUS This manual describes the installation and operation of the New Buck Corporation, Model 80 wood heater. These heaters meet the

Page 26

ACHIEVING CATALYTIC LIGHT-OFF WHEN REFUELING During the refueling and rekindling of a cool fire, or a fire that has burned down to the charcoal phas

Page 27

SECTION II MASONRY INSERT INSTALLATION INSTALLATION PRECAUTIONS It is not necessary to direct connect this unit, but testing has shown that it is n

Commentaires sur ces manuels

Pas de commentaire