MODEL 94NC NON-CATALYTIC UNIT Buck Stove FEATURES PREPARATIONS INSTALLATION OPERATION MAINTENANCE SAFETY FIREPLA
INSTALLATION PROCEDURE (Use a chimney connector or a Listed Direct or Positive Connect) (See Page 6). POSITIONING HEATER When positioning
8. Obtain outer trim kit provided with insert kit and slip over top and sides of trim panels.(See Figure 7). (Top ends of outer trim may need to
The connector and/or chimney should be inspected at least once a month during the heating season to determine if a creosote buildup has occur
SECTION IV RESIDENTIAL FREESTANDING INSTALLATION Select an installation location that will give best airflow from front of heater
Chimney This model is designed for connection to any listed 2100º UL103 HT chimneys and parts. Follow chimneys manufacturer's instructions c
Step (b): Calculate R of proposed system. 4” brick of C=1.25, therefore Rbrick = 1/C = 1/1.25 =0.80 1/8” mineral board of K = 0.29, therefore Rmin.b
Page 14 a) Minimum 3.5-in thick brick masonry all framed into combustible wall with a minimum of 12-in brick separation from clay liner to combustibl
B. Wall Exit Into Metal Tee-Box 1. Mark plumb line on wall directly behind center of heater. (See Figure 11). NOTE: When using 24# ga.
3. Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe, maintaining clearances to ceiling as noted in (Figure
Connectors may pass through walls or partitions constructed of combustible material if connector is: (a) Either listed for wall pass-through or is
FINAL CHECK 1. Recheck specified clearances. 2. Remove all foreign material from firebox area. 3. Open primary air control. Primary Air Control
CLEARANCES FOR MODEL 94NC MINIMUM CLEARANCES TO COMBUSTIBLES RESIDENTIAL SINGLE WALL CONNECTOR Figure 13 A B
SECTION VI WOOD HEATER SAFETY Certain safety hazards are inherent in any wood heater installation. You should be aware of these so that a safe a
SECTION VII OPERATION This section of the manual is to help you get maximum efficiency and maximum smoke (particulate) reduction from your heater.
ROOM AIR BLOWER OPERATION Your heater is equipped with a room air blower. For operation and wiring see figure 14. For your convenience your heater
SECTION VIII TROUBLESHOOTING PROBLEM POSSIBLE CAUSE SOLUTION Sluggish Heater Obstruction in chimney Check for and remove obstruction Improper
TROUBLESHOOTING (Continued) PROBLEM POSSIBLE CAUSE SOLUTION High fuel consumption Improper regulation of draft or inlet air (a) Close inlet air
REPLACEMENT PARTS FOR MODEL 94NC Description Part Number 1. Primary Air Handle PS 94NC040 2. Door Handle Assembly PA 910096 3. Door Latch PC
NEW BUCK CORPORATION (NBC) "LIMITED WARRANTY" FOR THE BUCK STOVE PLEASE READ THIS WARRANTY CAREFULLY PRODUCTS COVERED This warranty cove
If for any reason you are dissatisfied with the suggested procedures, you may contact us in writing at: New Buck Corporation Customer Ser
TABLE OF CONTENTS Important Instructions ... 2 SECTION I: Introduction ...
INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODEL 94NC BEFORE INSTALLING YOUR NEW BUCK STOVE, READ THE ENTIRE INSTRUCTION MANUAL IMPORTA
SECTION I INTRODUCTION Your new MODEL 94NC is a non-catalytic unit designed to meet the most stringent emissions standards without use of a
EPA COMPLIANCE STATUS The Model 94NC heater meets U.S. Environmental Protection Agency’s Emission limits for non-cat wood heaters sold after July 1,
SECTION II MASONRY INSERT INSTALLATION The Model 94NC may be installed using an all masonry fireplace built in accordance with Uniform Building
POSSIBLE TOOLS NEEDED FOR INSTALLATION If you decide to install your own stove, there are several hand tools you may need to do the job. If you do n
OPTION (B) Figure 3, REMOVE DAMPER OR WIRE IT OPEN BLOCK-OFF PLATE OR DAMPER ADAPTER SEAL TRIM PANELS WITH INSULATION OR HIGH TEMPERATURE CAULK S
Commentaires sur ces manuels